Goodenough Wide

Premier Fix Selected For London House

We have recently started work on the refurbishment of a 320 bedroom student accommodation scheme at Goodenough College in Central London.

As well as installing tiling in all student accommodation rooms, we are also installing to core shower and toilet areas across all levels of this period building.

We are also responsible for tanking all shower areas prior to installing wall and floor tiles to shared shower and washroom facilities.

The entire project is due for completion in July 2014.

Leave a Reply

You must be logged in to post a comment.