Selfridges2

Premier Install @ Selfridges London

We have just completed a major wall & floor tiling refurbishment project of the lower ground floor WCs at Selfridges Oxford Street, that has now been opened to shoppers as of the 14th August.

Our role within the project involved the installation of 600x50mm porcelain wall tiles and matching 600x150mm flooring. All walls were finished with a chrome shadow gap, that finished flush with plasterboard wall linings and door frames.

This schedule on this one was very intense, with Premier’s labour covering 24hr rotating shifts to ensure that client hand overs and deadlines were met on time and on budget.

If you find yourself in Selfridges pop down and take a look at the high standard of finish we are able to offer our commercial clients.

[nggallery id=20]

 

Leave a Reply

You must be logged in to post a comment.